Define
Separate essential, transaction, functional and cosmetic scope.
A private capital-control room for Bexar County owners comparing an as-is exit with selective repair or full renovation—after carrying time, contingency and market risk.
This site models entered assumptions. It does not estimate value, diagnose conditions, specify work, select a contractor or determine permits, compliance, insurance coverage, tax treatment or the correct sales path.
Open the modelSeparate essential, transaction, functional and cosmetic scope.
Make all bids price the same work, materials and closeout.
Add contingency, carrying time, financing and an adverse case.
Require matched market support for the claimed price lift.
Set cash, date, change-order and stop-work limits in writing.
Use the same payoff, title, transition and tax-reserve assumptions in both lanes. The renovation lane must also carry scope, uncertainty, time, financing and selling friction.
Count construction time, permit/inspection time, corrections, market exposure and closing—not only days when workers are present.
A low number can be a different scope, excluded permit, thin allowance or missing finish—not a bargain.
Compare licenses/registration, insurance, exact scope, material specifications, permits, inspections, change-order rules, payment milestones, cleanup, warranty, lien protection and references before price.
Rate the operating file—not confidence in the contractor, agent or market.
Plans/specifications identify what is included, excluded, salvaged and owner-supplied
Jurisdiction, permits, trade licenses, inspections and closeout documents are confirmed
Parties, scope, schedule, change orders, payments, cleanup, warranty and dispute terms are written
Texas homestead/lien duties, subcontractor notices and conditional/final releases have qualified review
Base scope, contingency, carrying costs and financing are actually funded without unsafe assumptions
Vacancy, utilities, weather, security, insurance and hidden-condition access are addressed
Price evidence, launch standard, agent/offer path, showing and appraisal risk are written
A maximum spend, maximum date and scope-change rule trigger a pause or exit
These resources provide official starting points. Property jurisdiction, scope, contract, current records and qualified professionals control.
Official permit routing for remodel, repair, demolition, roofing, foundation and trade work within San Antonio city limits.
Official City portal for permits, contractor activity and related Development Services records.
Official San Antonio Contractor Connect search plus registration-category, permit, inspection and complaint information.
Official guidance on multiple written bids, detailed contracts, payment milestones, homestead liens and subcontractor risk.
Official Texas license verification for regulated trades and occupations, including electrical, HVAC and mold work.
Official search for Texas real-estate brokers, sales agents, inspectors and other TREC-regulated license holders.
Official claim documentation, estimate, contractor, lender-check and payment guidance for covered property damage.
Official adjusted-basis, improvement, repair, selling-expense, exclusion and gain/loss guidance and worksheets.
No. Cost and market contribution are different. Buyers may discount work they dislike, over-improvement, incomplete permits, workmanship risk or a changing market. Use matched closed comparables and independent local review.
First separate active safety/damage, legal or permit issues, transaction blockers and system failures from optional finish work. Protect the property first; then compare each scope item’s cost, time, uncertainty and likely buyer impact.
There is no universal percentage. Intrusive work, an older house, incomplete diagnostics, additions, prior unpermitted work, supply uncertainty and occupied conditions increase risk. Price known scope separately from unknown-condition reserves.
A contractor can price and explain construction. A value claim should be supported by relevant market evidence and, when appropriate, qualified real-estate or appraisal professionals. Never let an unsupported resale promise justify a binding construction contract.
Some general repairs may be exempt, while remodel, structural, roofing, foundation and trade work commonly require permits or licensed trades. The property’s jurisdiction and exact work control. Confirm before starting.
Not until every bid is normalized to the same scope, specifications, permits, allowances, exclusions, timeline, cleanup and closeout. Verify applicable registrations/licenses, insurance, references and complaint history.
Use a written milestone schedule tied to verifiable work and required inspections. Texas consumer guidance warns against paying in full before completion and highlights lien exposure when subcontractors or suppliers are unpaid. Obtain qualified advice for the contract and releases.
IRS Publication 523 distinguishes qualifying improvements from maintenance and repairs, with exceptions for repair-type work inside an extensive restoration. Insurance reimbursement, credits, prior rental/business use and removed improvements can change the calculation. Keep records and obtain tax advice.
Protect the property from further damage and document conditions, but coverage, deductibles, claim history, lender involvement and approved scope matter. Follow the policy and Texas Department of Insurance guidance; do not promise coverage in the project budget.
No. Contract wording does not erase applicable disclosure, fraud, title, code or other duties. Property facts and the transaction structure matter. Use qualified legal and real-estate advice for the specific sale.
Bexar County Home Buyers can provide a no-obligation as-is property option for comparison. We do not appraise the property, prescribe repairs, manage the project or claim that selling is the best answer.